Liberty Networks announced the launch of MAYA-1.2, an enhanced system that doubles the capacity of the MAYA-1 subsea cable and is designed to power the region’s digital future. The MAYA-1.2 cable system is expected to be ready for service by the first half of 2026.

The newly configured MAYA-1.2 system spans 2,386 km, with a minimum ring design capacity of 4 Tbsp., and will retain three vital landing points: Hollywood, Florida (USA); Puerto Cortés, Honduras; and Half Moon Bay, Grand Cayman. This reconfiguration secures long-term capacity and services for member operators while strengthening international connectivity for businesses, governments, and communities across the region. 

MAYA-1.2 Cable System
Liberty Networks coverage map of MAYA-1.2

 

The Maya-1.2 cable system forms one of the two critical international subsea cables connecting Cayman Islands, in addition to the Cayman-Jamaica Fiber System (CJFS).

The Maya-1.2 cable system will benefit the Cayman Islands with expanded capacity up to 4 Tbps in each direction, lower latency to the US of 19 milliseconds on the short path (decreased from 21.4 ms) and 29 milliseconds on the long path (decreased from 70 ms), and modernized technology with new generation of Submarine Line Terminal Equipment (SLTE) to surport flexible spectrum loading and 100G/400G interfaces, a major leap from legacy 10G/40G technology deployed in the Maya-1 cable system. 

This strategic upgrade represents a long-term investment in regional infrastructure, strengthening international connectivity and digital resilience throughout the Caribbean and Central America. The project is being carried out in partnership with the new MAYA-1.2 consortium members. Alcatel Submarine Networks (ASN) will serve as the lead technology and marine services partner. Liberty Networks will be the primary operator and owner of the new MAYA-1.2 system. 

In addition to the upgrade, Liberty Networks and its MAYA-1.2 consortium partners are taking a sustainable approach by removing, recovering, and scrapping the southern portion of the MAYA-1 trunk. This will clear the way for the installation of MANTA, the new pan-regional subsea cable system, which will provide additional international routes for the Cayman Islands, both north and south. 

Maya-1 Cable Route
Originally Maya-1 Cable Route

 

Cayman government has approved a legislation, the Submarine Cable (Telecommunications Resilience) Bill 2025, which aims to allow government to partner with a private company to build a branch route from existing subsea cable networks into Cayman.

The MANTA cable system is likely to become the third international subsea cable systems connecting Cayman Islands.