The ASSC-1 submarine cable system is a new cable connecting Australia, Indonesia and Singapore, comprises four fibre pairs and spans a distance of 4,600 km.
The ASSC-1 consists of three express fiber pairs directly linking Perth and Singpare and one omnibus fibre pair between Perth, Jakarta and Singapore.
The ASSC-1 cable system will have an initial design capacity of 6.4 Tbps, running at 40 Gbps technology, with the capability to be upgraded to 100 Gbps in the future.
The ASSC-1 cable system is scheduled to be ready for service by the end of 2013.