Tasman Global Access (TGA) is 2300km submarine cable system connecting New Zealand and Australia.
The TGA consortium comprises Vodafone New Zealand, Spark New Zealand and Telstra.
The TGA cable system lands at:
The TGA cable system consists of two fiber pairs, with a design capacity of 20Tbps, deploying 100G DWDM technology.
The TGA cable system was supplied by Alcatel Submarine Networks (ASN), with a total cost of about US$70 million.
The TGA cable system was ready for service in March 2017.