Submarine Networks Submarine Networks Open Cable Community
  English (UK)
  • 简体中文(中国)

Sidebar

  • Home
  • Systems
    • Trans-Atlantic
      • Dunant
      • AEC-2/HAVFRUE
      • MAREA
      • AEC-1/AEConnect
      • Hibernia Express
      • Hibernia Atlantic
      • AC-1
      • Apollo
      • AC-2
      • Columbus-III
      • FA-1
      • TGN-Atlantic
      • TAT-14
    • Trans-Pacific
      • HKA
      • JUPITER
      • PLCN
      • NCP
      • FASTER
      • SEA-US
      • Palau-Guam
      • AAG
      • China-US CN
      • Japan-US CN
      • PC-1
      • Unity
      • TPE
      • TGN-Pacific
      • Southern Cross
      • Telstra Endeavour
      • TPC 5
      • Guam-Philippines
      • PPC-1
      • ASH/SAS
      • Honotua
    • Intra-Asia
      • APCN
      • APCN-2
      • EAC-C2C
      • FNAL/RNAL
      • TGN-IA
      • APG
      • ASE
      • Cahaya Malaysia
      • SJC
      • KJCN
      • MCS
      • MIC-1
      • TIC
      • i2i
      • WAC
      • TIS
      • BLCS
      • BDM
      • DMCS
      • GBI
      • TSE-1
      • ICX
      • BBG
      • SeaX-1
    • Intra-Europe
    • Asia-Europe-Africa
      • PEACE
      • AAE-1
      • EASSy
      • FALCON
      • FLAG FEA
      • SAFE
      • SEA-ME-WE 3
      • SEA-ME-WE 4
      • SEA-ME-WE 5
      • SEACOM
      • RJK
      • RJCN
      • HSCS
      • IMEWE
      • EIG
      • TGN-EA
      • MENA
      • TEA
      • GBI
      • G2A
      • Arctic Fiber
      • IOX
    • South Pacific (Australia-US)
      • Pacific Fibre
      • PPC-1
      • Southern Cross
      • Telstra Endeavour
      • Optikor Network
      • TGA
      • Hawaiki Cable
    • Asia-Australia
      • AJC
      • ASC
      • SMW3
      • ASSC-1
      • INDIGO
      • PNG National
      • PPC-1
      • Trident
    • Eurasia Terrestrial
    • North-South Americas
      • Seabras-1
      • MONET
      • AMX1
      • BRUSA
      • Curie
    • Brazil-Africa
      • SACS
      • SAIL
      • SAEx
    • Africa West Coast
      • WACS
      • MainOne
  • Stations
    • Africa
    • Asia
      • Japan
      • Korea
      • China
      • Taiwan
      • Hong Kong
      • Vietnam
      • Philippines
      • Brunei
      • Singapore
      • Indonesia
      • Malaysia
      • Thailand
      • Myanmar
      • Sri Lanka
      • India
      • Bangladesh
    • Europe
      • Russia
    • North America
      • USA-West Coast
      • USA-East Coast
      • USA-Guam
      • USA-Hawaii
    • South America
    • Oceania
      • Australia
      • American Samoa
      • Samoa
      • French Polynesia
      • New Zealand
      • Papua New Guinea
      • Fiji
  • Capacity Watch
    • Promotions
  • Insights
  • Events
    • Submarine Networks World 2022
  • Services
  • My Account
    • Overview
    • Management
    • Create an account
    • Forgot your username?
    • Forgot your password?

EllaLink

EllaLink is a submarine cable connecting Brazil and Europe, linking the major hubs of Sao Paulo and Fortaleza with Lisbon and Madrid. The main section of the EllaLink cable traveling from Sines to Fortaleza is approximately 5900 km.

The EllaLink cable system delivers 100Tbps of capacity over 4 fibre pairs, up to 25Tbps per fibre pair capacity direct from Europe to Latin America.

The EllaLink cable system is supplied by ASN, with €25 million ($27.2m) financial support by the European Commission as part of its Building Europe Link to Latin America (BELLA) initiative.

EllaLink was a partnership between Spanish submarine cable operator IslaLink and Brazilian state-owned telecoms provider Telebras. By the end of 2019, Telebras had withdrawn from the EllaLink cable project.

EllaLink collaborates with Telxius to land the cable at Telxius' Fortaleza Cable Landing Station. 

Ellalink creates a new landing site and an innovation & data center hub in Sines – Sines Tech.

The EllaLink cable system offers less than 60ms round trip delay (RTD) to cross the Atlantic connecting Portugal to Brazil, and less than 120ms RTD between Marseille and São Paulo.

The EllaLink cable system has been ready for service as of June 1, 2021.

The EllaLink Cape Verde Branch went live on June 6, 2022, with capacity up to 30Tbps.

 

EllaLink cable map

Title Published Date Hits
EllaLink Finalizes Agreement with ASN 12-01-19 Hits: 3177
Cabo Verde Telecom and EllaLink sign agreement for connectivity to Cabo Verde on the EllaLink Submarine Cable System 14-12-18 Hits: 1587
EllaLink Cable Project Backed by €25 million EU Financial Support 29-07-18 Hits: 2603
EMACOM and EllaLink Sign an Agreement to Connect Madeira to Mainland Portugal With a Dedicated Fibre Pair on the EllaLink Submarine Cable System 28-05-18 Hits: 2416
Marguerite II Joins EllaLink Cable as Financial Sponsor 10-05-18 Hits: 1609

Page 3 of 4

  • Start
  • Prev
  • 1
  • 2
  • 3
  • 4
  • Next
  • End

Latest Articles

  • Unitirreno Submarine Cable Project Achieves Contract-in-Force (CIF)
  • ONATi Upgrades Honotua Cable System with Ciena Solutions
  • Vodacom Lands 2Africa Subsea Cable in the Eastern Cape, South Africa
  • América Móvil and Telxius to Build AMX3/Tikal Subsea Cable
  • Southern Cross NEXT Delivers 400GbE with Ciena 6500 Platform
  • Aqua Comms Acquires India-based Openbyte Infrastructure
  • Unity Cable System Upgrades to 7.4Tbps per FP with Infinera ICE6 Solutions
  • Amanzimtoni Cable Landing Station (WIOCC)
 
 
 
Privacy Policy | Terms of Use | About Us

All Rights Reserved,SubmarineNetworks.com