Select your language
The Moratelindo International Cable System-3 (MIC-3) is a new submarine cable linking Batam and Singapore, directly targeting the volatile bandwidth scaling demands generated by Southeast Asia’s artificial intelligence (AI) cloud clusters.
The MIC-3 cable system is owned and developed by MoraRepublic, born out of a strategic mega-merger finalized at the end of December 2025 between infrastructure giant Moratelindo and retail broadband disrupter MyRepublic Indonesia.
The MIC-3 cable system is supplied by Chinese marine network vendor HMN Technologies (HMN Tech).
The technical architecture of the MIC-3 cable system features:
Meanwhile, Moratelindo has partnered with PT Jejaring Mitra Persada (JMP), a subsidiary of PT Ketrosden Triasmitra Tbk (KETR), to build the Rising 8 submarine cable project — officially named SKKL (Jakarta–Batam–Singapore Subsea Cable Communication System) Rising 8 — connecting Jakarta, Batam, and Singapore. The Rising 8 seems to interconnect with the MIC-3 to extend it from Batam to Jakarta.
In addition to MIC-3 / Rising 8, there are multiple new subsea cables targeting the Singapore - Batam - Jarkata AI corridor, including:
The Barat Timur Indonesia (BTI) cable system links Batam, Jakarta, and Manado and the Super Sistem Batam Singapore (SSBS) cable system connecting Batam to Singapore, developed by Super Sistem Group.
