A consortium of telecommunications operators and digital infrastructure providers announced Tuesday (May 12, 2026) the signing of a Memorandum of Understanding (MoU) to develop the Via Africa submarine cable system, a new high-capacity link designed to enhance connectivity diversity and resilience between Europe and Africa.

Key Consortium Members

The Via Africa consortium members include:

  • Orange Group: Leading telecommunications operator in Europe, Africa, and the Middle East
  • Orange Côte d‘Ivoire: Orange’s subsidiary in Côte d‘Ivoire, a key West African market
  • Sonatel: Senegal-based telecommunications operator (part of the Orange Group)
  • Canalink: Telecommunications or infrastructure provider
  • GUILAB: Digital or infrastructure player
  • International Mauritania Telecom: Mauritania’s national telecommunications operator
  • Silverlinks: Digital infrastructure or investment partner

Project Overview and Route

The Via Africa cable system is planned as a consortium-based infrastructure, allowing participating partners to co-invest in the system and take part in its governance. This model enables investors to participate directly in decisions regarding design, deployment, and operation, ensuring the infrastructure meets their specific needs.

European Landings: United Kingdom, France, Portugal

Atlantic Coast Destinations: Canary Islands (Spain), Mauritania, Senegal, Guinea, Côte d'Ivoire, Nigeria

Southern Extension: Further south to South Africa

The Via Africa cable system is designed to provide a different subsea route than existing infrastructure, such as 2Africa, Equiano and Medusa Africa, contributing to greater diversity and resilience of international connectivity serving the African continent. By avoiding single points of failure, the cable will strengthen the robustness of regional connectivity.

Addressing Africa‘s Growing Connectivity Needs

The African continent continues to experience rapid growth in digital traffic, driven by cloud adoption, mobile broadband expansion, and the emergence of AI and data-intensive applications. Existing subsea cables serving the West African coastline include:

  • SAT-3/WASC (2002): Portugal – Senegal – Côte d‘Ivoire – South Africa (aging)
  • WACS (2012): Portugal – Namibia – South Africa (operational)
  • ACE (2012): France – Portugal – West Africa – South Africa (operational)
  • MainOne (2010, expanded): Portugal – Senegal – Côte d’Ivoire – Nigeria – Ghana
  • 2Africa (2025): Meta-led project
  • Equiano (2023), privately owned by Google.

The Via Africa system will offer a new, diverse route that complements these existing systems, reducing concentration risk and providing additional capacity where demand is growing fastest.

The open cable project is explicitly designed to contribute to greater diversity and resilience of international connectivity serving Africa. By establishing a different subsea route than existing infrastructure, the system will reduce dependence on any single cable corridor, mitigating the impact of potential disruptions caused by natural disasters, anchor damage, or geopolitical events.

Project Timeline and Next Steps

Phase 1 – Route Study: Consortium members will jointly finance a cable route study to identify the optimal cable route that balances resilience, technical feasibility, and overall economic efficiency.

Phase 2 – Supplier Procurement: The consortium is preparing the procurement process for selecting a cable supplier.

Phase 3 – Construction and Deployment: To be determined following route study and supplier selection.

The Via Africa submarine cable project represents a significant addition to the Europe-Africa connectivity landscape. With a consortium of established telecom operators and digital players, the project is well-positioned to proceed through the route study and procurement phases.

As the project advances, it will provide a new, diverse, and resilient digital corridor between Europe and Africa, supporting the continent‘s continued digital transformation and economic growth.