The Ceiba-1 cable system is a 287km submarine cable connecting Malabo and Bata in Equatorial Guinea.
The Ceiba-1 cable system consists of 4 fiber pairs, with system capacity more than 1Tbps, supplied by ASN, ready for service in June 2011.
The Ceiba-1 cable system is owned and operated by the Manager of Telecommunications Infrastructure of Equatorial Guinea (GITGE, El Gestor de Infraestructuras de Telecomunicaciones de Guinea Ecuatorial).
Additionally, GITGE owns and operates the Ceiba-2 cable system connecting Malabo and Bata in Equatorial Guinea, with a branch to Kribi in Cameroon.
The Ceiba-2 cable system forms a redundant route connecting Malabo and Bata in Equatorial Guinea.