The Hokkaido-Sakhalin Cable System (HSCS) is a single span 500 km linear undersea cable system between Ishikari, Hokkaido in Japan and Nevelsk, Sakhalin in Russia, jointly built by TTK and NTT. The HSCS has a design capacity of 640 Gbps. And the HSCS was ready for service on July 3, 2008. With the seamless combination of the HSCS and the Europe-Russia-Asia (ERA), a trans-Russia terrestrial backbone of TTK, NTT and TTK can offer an alternative and low latency route for the traffic between Asia and Europe.
System Profile
Cable System:
- HSCS, or Hokkaido-Sakhalin Cable System
Cable Length:
-
- 500 Km
Design Capacity:
- 640 Gbps
Lit Capacity:
- bps
Ready for Service Date:
- July 3, 2008
Investment Type:
- Consortium
Initial Investment:
- US$ million
Owner(s):
- TransTelecom (TTK)
- NTT Com
Landing Stations:
Vendor:
- NEC