Nedonna Beach is the cable landing site for the TPE cable and TGN S1 cable. The Nedonna Beach Cable Landing Site is about 150 miles away from the terminal stations in Hillsboro. Nearby the Nedonna Beach cable landing site, there are terminal stations for the Power Feeding Equipment (PFE).

 

{mosmap width='500'|height='400'|lat='45.644078'|lon='-123.940131'|zoom='12'|zoomType='Large'|zoomNew='1'|mapType='Map'|showMaptype='1'|overview='1'|text='Nedonna Beach Cable Landing Site'|tooltip='Nedonna Beach Cable Landing Site'|marker='1'| align='center'|lang=''}

 

Station Name:

  • Nedonna Beach Cable Landing Site

 

Submarine Cable Systems: