Miura Cable Landing Station (Ajigaura CLS) locates in Ajigaura, Hitachinaka, Ibaraki Prefecture, Japan. The Miura CLS is the cable landing station for the FEA, APC, NPC and intra-Japan submarine cable systems.

 

Station Name:

Miura Cable Landing Station, or Miura CLS

 

Station Owner:

KDDI

 

Available Backhaul Providers:

KDDI

 

Cable Systems:

  • FEA
  • APC (Asia Pacific Cable), a 7516 km submarine cable between landed at Miura and Miyazaki(Japan), Toucheng (Taiwan), Cape D'Aguilar (Hong Kong), Cherating (Malaysia) and Katong (Singapore), with design capacity of 3x560 Mbps and activated in 1993.
  • NPC (North Pacific Cable), a 9531 km trans-Pacific submarine cable system landed at Miura (Japan), Pacific City (Oregon, USA) and Seward (Alaska, USA), with a design capacity of 3x420 Mbps, activated in 1991.