Select your language
Insights & view points from industry professionals.
There are different ways to meet the high traffic demand in Submarine cable. We need more capacity. Demands keeps on increasing. How we can achieve it?
More Submarine cables, more number of channels (C+L band system), more number of fiber pairs, increasing per fiber capacity, increasing channel bandwidth i.e transponder/modem capacity.
Before 2018, the focus was on increasing the per fiber pair capacity. However, it has almost reached the maximum. Then why not, increasing the capacity in system level.
Used international bandwidth almost doubles in every two years on a global average, there is even higher growth rate for international bandwidth from Asia to Europe. The geographic position of Egypt allows for an efficient crossing from the Red Sea to the Mediterranean Sea for Asia to Europe connectivity. Almost all the existing submarine cables connecting Asia, Africa and Europe are crossing Egypt. SubmarineNetworks.com has an intensive Study on Submarine Cables Crossing Egypt and their Costs. The full Study Report is available upon ordering.
On January 29, 2020 Google and Facebook filed a request with the U.S. Federal Communications Commission (FCC) for special temporary authority to activate limited portions of the Pacific Light Cable Network (PLCN). The PLCN links Hong Kong with Los Angeles, and includes branching units to the Philippines and Taiwan. Construction of PLCN was completed in 2019, and reports have estimated the cost to design and build PLCN at USD$400M. The system is now sitting idle.
As of December 2019, there are 74 FCC licensed submarine cable systems in the US, and 12 pending new submarine cable landing license or renewal applications. The FCC needs to coordinate with other Executive Branch agencies (such as Team Telecom) applications where a foreign citizen or foreign-organized entity, including foreign government, would hold a 10 percent or greater direct or indirect equity or voting interest in the licensee.
Infrastructure and institutional investors are increasingly turning their attention to digital infrastructure assets and the global rollout of fibre broadband. Fibre-to-the-home in particular is seen as an essential component of digital transformation and as providing a large pool of investment opportunities.
Though the sector has traditionally been dominated by telecoms players, recent years have seen more interest and deal activity from infrastructure investors and their lenders.
This article is part-two of the previous article – Mumbai-Chennai-Singapore, the Superhot Submarine Superhighway. It completes the narrative on new submarine cables to be unveiled in the course of 2020 that are set to land in India. Designating it part-two made sense as Mumbai-Chennai-Singapore initiatives is few steps ahead of Mumbai-Marseilles with respect to new submarine cables.
Does it look impudent marketing to designate the 5500 kms Mumbai-Chennai-Singapore subsea route as superhot submarine superhighway! Its relevance as standalone subsea route from the international gateways of global connectivity in north-west and south-east coast of India to APAC business hub of Singapore is as important as segment of the larger SEA-ME-WE Eurasian subsea corridor.
Africa may be a growing hub of digital innovation, particularly noticeable in Johannesburg, Cape Town, Nairobi and Lagos – with companies in these metropolitan areas taking advantage of high-speed fibre connections to embrace the cloud and develop new business models and processes. These leading-edge companies are connecting with their peers more-and-more at a regional and global level.
This article takes a closer look at 15 submarine cables facing challenges, that have either prevented them from reaching CIF or the implementation not reaching RFS or operational cables whose mainstream acceptance or economic lifespan is threatened by under-utilization.
Acquisition, ownership and operation of Submarine Fiber Pair is the ultimate futureproof solution for scalable transoceanic connectivity, with design capacity of at least 12T/FP and goes up to 20T/FP, and even beyond. Interestingly that’s more than the total capacity of most of the consortium cables that land in India. Till date Submarine Fiber Pair acquisition was feasible only for the elites, the big-4 OTTs and Reliance Jio.