feed-image RSS Feed

The SEA-US cable system will link the five areas and territories of Manado in Indonesia, Davao in Southern Philippines; Piti in the territory of Guam; as well as Honolulu (on the island of Oahu), Hawaii; and Los Angeles, California in the continental U.S.

The system will be approximately 15,000 kilometers in length, stretched along a unique route and has been designed and engineered to bypass earthquake prone areas in East Asia, thereby providing a strategic diversity in the range of connectivity to transpacific networks with ensured stable connectivity.

The US $250 million SEA-US cable system is expected to be completed in the fourth quarter of 2016.