feed-image RSS Feed

The APX-West cable spans more than 4500km connecting Singapore and Perth, Australia. The APX-West cable consists of two fibre pairs, each with a minimum design capacity of 10 Tbps.

Construction is expected to begin by the end of July 2016 and scheduled to be completed by 2018.